Hello, i am new to aimms and completed the beginners tutorial and tried to understand the machine planning example, but it was to complicated for me to understand all of it.
I want to solve a scheduling problem but i have problems creating the model. Let me explain my situation: In the production there are build articles from different orders and they are transported inside the company within containers. The transport limitation is 8 containers an hour. I want to solve the problem and want the best order which is <= 8 containers an hour, if not possible, than the next following orders should be so small, that it will be compensated, if not possible, a gap with no production time should be inserted.
It would be ideal, that the same article is produced in one step (e.g. Article 52107 has to be build for 3 different customer orders). After all, i want to visualize it. My first problem is, that i don’t know how to produce on order after another and make the timeline to calculate the demand of containers per hour and how i iterate the different variations and store the best possibility.
I have attached the sample data. I would be glad, if anybody can provide me an example or help :)
Best answer by mohansx
View original