Would be great to allow users in SC Navigator to be able to quickly select/de-select which periods are considered in scope for a run from the UI (similar to selecting ‘Considered Products’ in the Control Panel) without having to manually remove them from the excel template.
This would also allow them to create batch runs in the Scenario Navigator module to evaluate performance and results curves based on period selection.